QCL-12 12 kV gas-insulated ring main unit switchgear

Utility Distribution Solutions

Project Solution

Utility Distribution

Reliable secondary distribution for utility networks and distribution substations.

Request Technical ProposalSend Your SLDWhatsApp Engineer

Project Scenario

Reliable secondary distribution for utility networks and distribution substations.

Typical Project Inputs

Voltage, load, fault level, SLD, site conditions, protection requirements, quantity and delivery schedule.

Recommended Equipment

RMU & GIS

12–40.5kV project-specific selection.

MV Switchgear

Air- or gas-insulated solution according to SLD.

Compact Substation

Integrated MV transformer LV package where applicable.

Engineering Support

  1. Requirement and SLD review
  2. Equipment and configuration selection
  3. GA and technical document preparation
  4. Inspection and FAT coordination
  5. Packing and delivery documentation

Related Evidence

Only verified project, FAT, packing, shipment and application evidence will be linked.

Complete Engineering Solution Scope

Project Scenario

Primary and secondary distribution networks, ring feeders, transformer substations, urban distribution rooms and network reinforcement projects.

Typical Challenges

  • Maintaining supply continuity and clear operating logic
  • Selecting compact equipment for restricted substations
  • Coordinating utility protection, metering, interlocks and remote signals

Typical Voltage

Common project classes include 10/11/12kV, 20/22/24kV and 33/35/36/40.5kV. The applicable equipment class is confirmed from the nominal voltage, highest system voltage, insulation level and project standard.

Recommended Equipment & Products

QCL-12 RMU for 10/11/12kV systems, QCL-24 GIS for 20/22/24kV systems, QCL-40.5 GIS for applicable 33–40.5kV projects, plus XGN15-12 AIS RMU.

Review QCL-12, QCL-24, QCL-40.5, XGN15-12 and YB-12.

Typical Configuration

Typical arrangements may combine ring cable units, breaker or fuse transformer protection, PT/metering and bus-section functions. Final functions follow the utility SLD.

SLD, GA Drawing & Technical Clarification

Qiangchi reviews the SLD, BOQ and specification, prepares a project-specific configuration and coordinates GA drawings, interface details, component schedule and technical clarifications before production release.

Manufacturing, Testing & FAT

Manufacturing follows the approved documents. Inspection and routine testing are completed according to the applicable product and agreed requirements. Customer or third-party FAT witness scope can be confirmed in the inspection plan.

Packing, Delivery & Handover

Equipment is prepared for export handling according to cabinet size, destination and transport method. Packing list, shipping marks, agreed test records and technical documents are coordinated before dispatch. Lead time is confirmed according to configuration and quantity.

Related Technical Guides

Request a Utility Distribution Technical Proposal

Upload the SLD, BOQ and specification for configuration review.

Upload SLD / Request Proposal   WhatsApp Engineer