Installation & Application
Authorized and verified installation or application evidence.
Request Technical ProposalSend Your SLDWhatsApp EngineerEvidence Standard
Each record must identify region, application, voltage, equipment, quantity where publishable, project scope, configuration, engineering support, FAT, packing and shipment. Customer names are never invented.
Installation & Application Support
Qiangchi supports EPC and site teams with approved GA drawings, foundation and cable-interface information, panel lineup identification and project documentation.
Before Installation
- Check room access, foundation level and required clearances.
- Verify shipping sections, equipment identification and visible transport condition.
- Confirm cable entry, earthing points and interface dimensions against approved drawings.
- Keep equipment protected from moisture, dust and impact before energization.
Typical Site Sequence
Positioning → lineup connection → busbar and earthing connection → primary cable termination → secondary wiring → mechanical/interlock checks → pre-energization inspection. The exact sequence follows the supplied manual and approved project documents.
Applications
Utility distribution, industrial plants, solar and BESS projects, infrastructure, mining and prefabricated substations.