Evidence Standard

Each record must identify region, application, voltage, equipment, quantity where publishable, project scope, configuration, engineering support, FAT, packing and shipment. Customer names are never invented.

Factory Acceptance Testing Process

FAT verifies that the manufactured equipment matches the approved technical documents and agreed inspection plan before shipment.

Typical Inspection Sequence

  1. Approved drawing and bill-of-material reference check
  2. Visual, nameplate and dimensional inspection
  3. Mechanical operation and interlock checks
  4. Primary and secondary circuit verification
  5. Insulation and functional testing according to the agreed procedure
  6. Protection, indication and control checks where applicable
  7. Punch-list closure and FAT record preparation

Customer or Third-Party Witnessing

Witness arrangements, acceptance criteria and report format are confirmed before production completion. Tests and documents must correspond to the ordered model and configuration.

Test document control · Define FAT requirements

FAT and Pre-Shipment Coordination

Submit the approved SLD, technical specification and inspection plan before production release. Qiangchi can coordinate visual inspection, wiring verification, mechanical operation, interlock checks and agreed electrical tests before packing.