Direct answer: A factory acceptance test (FAT) verifies the manufactured switchgear against the approved drawings, specification and agreed inspection plan before shipment. It does not replace type testing or site commissioning.
Before FAT
Freeze approved drawings, component schedule, wiring diagrams, protection settings where applicable, inspection plan and witness requirements.
Typical FAT Checks
Identification and workmanship, dimensions, installed components, mechanical operation, interlocks, earthing, wiring continuity, control functions, relay or secondary-circuit checks and agreed routine electrical tests.
Witness and Records
Customer or third-party witness arrangements are agreed in advance. Results, punch items and supporting records are documented according to the contract scope.
After FAT
Close accepted punch items, issue the agreed records, complete protection and packing, and release the equipment for shipment.
Information to Send
Provide the specification, SLD, approved drawings, inspection and test plan, witness list, report format and any project-specific acceptance criteria.
Qiangchi Engineering Support
Qiangchi manufactures medium-voltage distribution equipment and supports project-specific configuration review, GA drawings, typical SLD coordination, technical clarification, inspection, FAT planning and export packing. Confirmed product options include the QCL-12 RMU, QCL-24 GIS, QCL-40.5 GIS, XGN15 AIS RMU and YB compact substation. Final values and dimensions are project-specific.
Frequently Asked Questions
What should I send for a quotation?
Send the SLD, BOQ, system voltage, rated current, short-circuit level, application, quantity, installation conditions and project specification.
Can Qiangchi propose a configuration?
Yes. A technical proposal can be prepared after review of the project requirements.
Are GA drawings available?
GA drawings are prepared according to the selected product, functional units and approved configuration.
Can FAT be arranged?
The FAT scope and witness requirements can be agreed during technical clarification.
Are all values fixed?
No. Unconfirmed values, dimensions and accessories remain subject to project-specific technical confirmation.
Where can I continue selection?
Use the Product Finder, review Selection Guides, or send the project documents directly.
Prepare Your MV Switchgear RFQ
Plan an FAT for Your Switchgear Project
Send the approved specification, drawings and inspection checklist before the FAT date. The test scope, witnessing method, records and acceptance criteria should be agreed for the exact product configuration.