Complete QCL-12 medium-voltage switchgear lineup

Infrastructure Power Distribution Solutions

Project Solution

Infrastructure

MV distribution for transport, municipal and other infrastructure projects.

Request Technical ProposalSend Your SLDWhatsApp Engineer

Project Scenario

MV distribution for transport, municipal and other infrastructure projects.

Typical Project Inputs

Voltage, load, fault level, SLD, site conditions, protection requirements, quantity and delivery schedule.

Recommended Equipment

RMU & GIS

12–40.5kV project-specific selection.

MV Switchgear

Air- or gas-insulated solution according to SLD.

Compact Substation

Integrated MV transformer LV package where applicable.

Engineering Support

  1. Requirement and SLD review
  2. Equipment and configuration selection
  3. GA and technical document preparation
  4. Inspection and FAT coordination
  5. Packing and delivery documentation

Related Evidence

Only verified project, FAT, packing, shipment and application evidence will be linked.

Project Scenario

Airports, rail facilities, data centres, commercial complexes and public infrastructure require dependable medium-voltage distribution with clear operating logic and future expansion capability.

Typical Challenges

High continuity requirements, limited electrical-room space, multiple critical loads, cable routing constraints and phased commissioning.

Recommended Equipment

QCL RMU/GIS, XGN15-12 air-insulated RMU, medium-voltage switchgear, compact substations and low-voltage switchboards selected by system level.

Typical Voltage & Configuration

Typical schemes use dual incoming feeders, bus section, transformer feeders, metering and spare functional units according to the approved SLD. Final ratings, protection and panel arrangement are confirmed from the approved SLD and project specification.

Engineering and Delivery Support

SLD Review

Feeder functions, busbar rating, protection and metering review.

GA Drawing

Panel lineup, dimensions, cable entry and foundation interface.

Technical Clarification

Project-specific deviations, options and document schedule.

Testing & FAT

Agreed inspection, functional checks and FAT documentation.

Export Packing

Protected packing and shipping-section planning for international delivery.

Start the Technical Review

Send the SLD, voltage, fault level, current, quantity and installation conditions. Qiangchi will prepare a project-specific equipment recommendation.

Request Technical Proposal Use Product Selector

Complete Engineering Solution Scope

Project Scenario

Transport, airports, ports, water facilities, commercial developments, public buildings and municipal distribution projects.

Typical Challenges

  • Limited electrical-room space and civil interfaces
  • High requirements for continuity, selectivity and phased construction
  • Coordination of cables, controls, metering, testing and handover documents

Typical Voltage

Common project classes include 10/11/12kV, 20/22/24kV and 33/35/36/40.5kV. The applicable equipment class is confirmed from the nominal voltage, highest system voltage, insulation level and project standard.

Recommended Equipment & Products

QCL-12/QCL-24 compact GIS, QCL-40.5 for applicable higher-voltage interfaces, XGN15 AIS and YB-12 compact substations.

Review QCL-12, QCL-24, QCL-40.5, XGN15-12 and YB-12.

Typical Configuration

Utility incomers, ring feeders, transformer feeders, bus section, PT/metering and standby connections are configured to the approved project scheme.

SLD, GA Drawing & Technical Clarification

Qiangchi reviews the SLD, BOQ and specification, prepares a project-specific configuration and coordinates GA drawings, interface details, component schedule and technical clarifications before production release.

Manufacturing, Testing & FAT

Manufacturing follows the approved documents. Inspection and routine testing are completed according to the applicable product and agreed requirements. Customer or third-party FAT witness scope can be confirmed in the inspection plan.

Packing, Delivery & Handover

Equipment is prepared for export handling according to cabinet size, destination and transport method. Packing list, shipping marks, agreed test records and technical documents are coordinated before dispatch. Lead time is confirmed according to configuration and quantity.

Related Technical Guides

Request a Infrastructure Technical Proposal

Upload the SLD, BOQ and specification for configuration review.

Upload SLD / Request Proposal   WhatsApp Engineer

Scroll to Top