Manufacturing Control, Testing and Inspection
Product execution is controlled against the confirmed equipment configuration, applicable project requirements and agreed inspection scope.
Send Your Inspection PlanControlled Manufacturing Workflow
Technical Release
Confirm model, parameters, drawings and bill of materials.
Incoming Check
Verify key materials and components against the approved scope.
Assembly Control
Check workmanship, wiring, mechanical operation and interfaces.
Final Inspection
Complete applicable routine checks and document the agreed results.
Project Inspection Scope
Visual & Mechanical
Appearance, identification, dimensions, interlocks and operating checks as applicable.
Electrical Checks
Wiring, insulation, continuity and routine test items according to product and project scope.
Document Verification
Review datasheets, drawings, inspection records and packing identification.
Factory Overview
Qiangchi organizes production around approved drawings, bill of materials, inspection requirements and delivery milestones. Each project moves through documented preparation, assembly, wiring, testing and export packing stages.
Enclosure Manufacturing
Cabinet panels, doors, partitions and mounting interfaces are prepared and checked against the approved GA.
Copper Busbar Processing
Busbar cutting, forming, surface treatment, identification and connection preparation follow the released design.
Mechanical Assembly
Switching devices, mechanisms, interlocks, compartments and structural parts are assembled for the selected configuration.
Electrical Assembly
Component Installation
Primary and secondary components are installed according to the approved bill of materials and drawings.
Secondary Wiring
Control, protection, metering, indication and terminal wiring are completed and checked against the schematic.
Identification & Traceability
Panel, device, terminal and cable markings are coordinated with project drawings and packing records.
Testing & FAT
| Stage | Typical Verification | Project Record |
|---|---|---|
| Mechanical inspection | Appearance, dimensions, operation and interlocking | Inspection checklist |
| Electrical inspection | Wiring, continuity, insulation and functional checks as applicable | Routine inspection record |
| FAT coordination | Agreed witness points and project-specific checks | FAT record or signed checklist |
| Document review | Datasheets, drawings, labels and packing identification | Approved document package |
The exact test scope and acceptance criteria are defined by the product standard, approved specification and inspection plan.
Finished Products & Export Delivery
Final Quality Release
Confirm configuration, identification, workmanship and required records.
Protective Packing
Apply suitable moisture, surface and mechanical protection for the shipment plan.
Export Marking
Coordinate package numbers, handling marks and packing lists.
Container Loading
Plan lifting, positioning and securing around the approved equipment dimensions.
Customer and Third-Party Inspection
Witness and third-party inspection requirements can be coordinated when defined in the project specification and confirmed commercial scope.
Define Quality Requirements Before Production
Send the inspection plan or project specification together with the RFQ.
Send SpecificationRoutine Test and FAT Matrix
The final inspection and testing scope is defined by the applicable product standard, approved drawings, project specification and agreed inspection and test plan. The following matrix describes the normal control logic; exact test items remain project-specific.
| Stage | Typical control points | Typical records |
|---|---|---|
| Incoming inspection | Component identity, ratings, quantity, visible condition and approved make where specified | Incoming check or material verification record |
| Mechanical assembly | Panel alignment, doors, partitions, operating mechanisms, earthing parts and fasteners | Assembly and visual inspection record |
| Busbar and primary circuit | Arrangement, connection, clearances, identification and torque control according to the approved design | Process inspection record |
| Secondary wiring | Wire numbering, terminal blocks, continuity, schematic correspondence and control-circuit functions | Wiring and functional check record |
| Mechanical operation | Switching operation, indications, shutters or doors where applicable, key and mechanical interlocks | Mechanical operation checklist |
| Electrical routine tests | Applicable insulation, main-circuit resistance, auxiliary-circuit, functional and protection checks | Routine test report according to agreed scope |
| Final release | Nameplate, labels, accessories, documents, cleanliness, packing protection and shipping marks | Final inspection and packing checklist |
FAT Workflow
- Plan: agree the inspection and test plan, witness points, participants and acceptance documents.
- Prepare: freeze approved SLD, GA, schematics, component schedule and project-specific test requirements.
- Inspect: complete visual, mechanical, wiring, interlock, functional and agreed electrical checks.
- Record: document results and identify any punch items without concealing deviations.
- Close: complete accepted corrections and issue the agreed records before shipment release.
Technical Handover Documents
The document package may include approved drawings, datasheets, component schedule, routine-test records, FAT records, packing list and operation information according to the contract scope. Certificates and type-test reports are supplied only where genuinely available and applicable to the agreed product.
Related Quality Evidence
- FAT & Inspection
- Packing & Shipment
- Project & Application Cases
- How FAT Works for MV Switchgear
- Test Reports
- Certificates
Define the Inspection Scope Before Production
Send the SLD, specification, inspection plan and witness requirements with your RFQ.
Quality Control and Project Documentation
Quality control covers incoming materials, assembly, wiring, mechanical interlocks, routine inspection, FAT coordination, finished-product verification and packing records according to the confirmed project scope.