MV switching + transformer + LV distribution

Prefabricated transformer substation

A factory-assembled substation that coordinates medium-voltage switching, a distribution transformer and low-voltage distribution in one enclosure. Configure the complete equipment scope from your SLD, load and site requirements.

12 kVHV equipment class
≤3150 kVAProject capacity scope
MV + LVWith transformer

No drawing yet? Start with your country, application and a short description.

YB-12 product arrangement reference
YB-12 exterior configuration reference. Final enclosure, equipment and layout follow the approved project drawings.

YB-12 / Product overview

One enclosure. Three coordinated equipment scopes.

Specify the interfaces between the compartments as carefully as the equipment within them.

MV

Medium-voltage compartment

Define incoming and outgoing functions, protection, metering, cable entry and the connection to the transformer.

TX

Transformer compartment

Coordinate capacity, voltage ratio, vector group, impedance, tapping, cooling and the installation environment.

LV

Low-voltage distribution

Specify the incomer, outgoing feeders, metering, compensation and protection requirements from the load schedule.

Technical reference

Key specifications and their application

Use the reference values below to start selection. The confirmed unit, drawings and technical agreement define the supplied equipment.

On a small screen, scroll the table horizontally to see the scope of each value.

YB-12 technical reference and scope
ItemReferenceHow to apply it
Product familyYB-12Prefabricated transformer substation
Typical catalogue system10 / 0.4 kVConfirm the required HV/LV ratio for the project
HV equipment class12 kVMaximum HV operating voltage stated in the catalogue
Rated frequency50 HzPublished catalogue reference
Transformer capacityUp to 3150 kVAProject capability, subject to the confirmed design
Equipment arrangementMV + transformer + LVComplete scope agreed against the SLD / BOQ
Transformer selectionProject-specificCapacity, type, cooling, protection and losses to be agreed
Enclosure and dimensionsApproved project drawingsVentilation, access, cable routing and footprint to be confirmed

Configuration & interfaces

Confirm the complete substation, including its interfaces

Agree the transformer and switching equipment together with the physical enclosure and installation requirements.

01

Electrical configuration

SLD, transformer data, protection philosophy, metering and LV feeder schedule define the supplied equipment.

02

Enclosure arrangement

Available footprint, doors, ventilation, cable entry and maintenance space define the project layout.

03

Site and delivery scope

State altitude, temperature, corrosion or seismic requirements, transport constraints and the required inspection documents.

Technical documents

Find the document for your next decision

Use product information for initial selection, then confirm project drawings and the evidence for the exact equipment you specify.

Engineering documents

YB-12 catalogue

Catalogue V2 · English · PDF

Overview of the prefabricated substation and project configuration information.

Open catalogue PDF

Engineering documents

GA & compartment layout

Project drawings

Coordinate the footprint, internal arrangement, ventilation, doors and cable interfaces.

Explore drawing support

Engineering documents

XG20051080 report

Controlled document request

Request the existing 1600 kVA sample report and review its applicability to the proposed project.

Request the full report

Working with Qiangchi

A clear path from requirements to agreed supply

For EPCs, panel builders, contractors and local partners, start with the equipment schedule and the responsibilities for the project.

  1. Share the SLD / BOQ

    Send your equipment requirements, destination and available specification.

  2. Review the configuration

    Clarify equipment scope, interfaces and applicable technical documents.

  3. Receive the proposal

    Review the project-specific technical proposal and quotation.

  4. Agree the supply

    Confirm the drawings, equipment, inspection documents and commercial scope.

The local partner handles local engineering and market-access requirements. Qiangchi supplies the equipment and documentation agreed for the order.

Selection questions

YB-12 questions

What is included in a YB-12 substation?

The coordinated arrangement contains MV switching and protection, a transformer compartment and LV distribution. The final equipment and enclosure scope are specified for the project.

What transformer capacity can be evaluated?

Project designs can be evaluated up to 3150kVA. The final transformer type, rating, cooling, enclosure and MV/LV arrangement must be confirmed together.

Does the available test report cover all capacities?

Report XG20051080 applies to the stated YB□ (STYB□)-12/0.4-1600 model and 1600kVA scope. It must not be treated as evidence for every capacity option.

What information should I send first?

Start with your country, required transformer capacity if known, and the application. We can then clarify voltage ratio, load, MV/LV configuration, protection, installation and delivery requirements.

Can the enclosure and drawings be customized?

Door arrangement, ventilation, cable entry, enclosure material, colour and protection degree can be coordinated with the project specification. GA dimensions follow the confirmed configuration.

Prepare your enquiry

Bring the details you already have

You do not need a complete tender package to start. These details help move the enquiry towards a configuration and quotation.

  • Country, application and load requirements
  • HV/LV voltage ratio and transformer capacity
  • SLD / BOQ and transformer requirements
  • MV protection and LV feeder schedule
  • Available footprint, cable entry and site conditions
  • Quantity, inspection scope and delivery schedule

Discuss your YB-12 requirement

Turn the project requirements into an equipment scope.

Share your application, drawings or specification. We can help clarify the configuration and documents needed for a project-specific offer.

Prefer email? sales@zgqci.com

Scroll to Top